COVID-19 – Force Majeure – Time Extension! What About Insurance?
- Posted by John P. Ahlers
- On March 23, 2020
The outbreak of the COVID-19 is at the forefront of everyone’s mind.[1] As outlined in previous blogs, generally, a pandemic may be considered a force majeure event, and if so, a construction contractor may be entitled to a time extension, but generally is not entitled to additional compensation. The bad news is that for the […]