Repairs Begin on Howard Hanson Dam (Green River)

The Army Corps of Engineers has commenced repairs at the Howard Hanson Dam to control the potentially destabilizing seepage to the earth and abutment. The repair should reduce the likelihood of winter flooding in the populace Green River Valley. The work will increase the Dam’s ability to reduce the downstream flooding risk. Funds from the Federal Stimulus Package are paying for the repair contracts.

To read the article click here

Scroll to Top